US 181 Harbor Bridge

A.H. Beck installed shafts for the 2.25 mile long US 181 bridge spanning the Corpus Christi ship channel.

Owner: Texas Department of Transportation

Contractor: Flatiron/Dragados

Location: Corpus Christi, Texas

Solution: Deep Foundations

Industry: Transportation

Techniques: Drilled Shafts

Owner: Texas Department of Transportation

Contractor: Flatiron/Dragados

Location: Corpus Christi, Texas

Solution: Deep Foundations

Industry: Transportation

Techniques: Drilled Shafts

A.H. Beck installed shafts for the 2.25 mile long US 181 bridge spanning the Corpus Christi ship channel.

Overview:

The 2.25-mile long US 181 bridge spanning the Corpus Christi ship channel, originally opened in 1959, is being replaced due to the need for a higher-capacity roadway, and to reduce the navigational restrictions for ships traveling under the existing bridge. The four-lane bridge is being replaced with twin parallel cable stay bridges containing a 1,655-foot main span over the channel. The two main pylons feature 538-foot towers supported by 21 shafts measuring 10 feet in diameter, drilled to a depth of 230 feet. Due to the high-water table and soft alluvial soils found at the site, the shafts are being constructed with a short permanent casing in the top 50 feet and bentonite slurry below the casing. A total volume of 300,000 gallons of bentonite slurry is needed to excavate one shaft of this diameter and depth.