US 181 Harbor Bridge Replacement

For the US 181 Harbor Bridge replacement project in Corpus Christi, TX the two main pylons feature 538-foot towers which are currently partially constructed. Each pylon is supported by 21 shafts measuring 10 feet in diameter, drilled to a depth of 230 feet which were installed by A.H. Beck in 2017/2018. A.H. Beck was brought back in 2023 to install additional shafts to supplement the existing pylon foundations. 48-inch diameter shafts along the north and south perimeter of the pylon footings were installed each to a depth of 230 feet. The shafts were installed underneath previously constructed portions of the bridge deck and in coordination with the ongoing construction of the pylon and bridge deck erection.

Owner: Texas Department of Transportation

Contractor: Flatiron & Dragados LLC

Location: Corpus Christi, Texas

Solution: Deep Foundations

Industry: Transportation

Techniques: Drilled Shafts

Owner: Texas Department of Transportation

Contractor: Flatiron & Dragados LLC

Location: Corpus Christi, Texas

Solution: Deep Foundations

Industry: Transportation

Techniques: Drilled Shafts

For the US 181 Harbor Bridge replacement project in Corpus Christi, TX the two main pylons feature 538-foot towers which are currently partially constructed. Each pylon is supported by 21 shafts measuring 10 feet in diameter, drilled to a depth of 230 feet which were installed by A.H. Beck in 2017/2018. A.H. Beck was brought back in 2023 to install additional shafts to supplement the existing pylon foundations. 48-inch diameter shafts along the north and south perimeter of the pylon footings were installed each to a depth of 230 feet. The shafts were installed underneath previously constructed portions of the bridge deck and in coordination with the ongoing construction of the pylon and bridge deck erection.

Overview:

For the US 181 Harbor Bridge replacement project in Corpus Christi, TX the two main pylons feature 538-foot towers which are currently partially constructed. Each pylon is supported by 21 shafts measuring 10 feet in diameter, drilled to a depth of 230 feet which were installed by A.H. Beck in 2017/2018. A.H. Beck was brought back in 2023 to install additional shafts to supplement the existing pylon foundations. 48-inch diameter shafts along the north and south perimeter of the pylon footings were installed each to a depth of 230 feet. The shafts were installed underneath previously constructed portions of the bridge deck and in coordination with the ongoing construction of the pylon and bridge deck erection.