Calaveras Lake Bridge

A.H. Beck installs drill shafts using an A.H. Beck custom hydraulic drill in San Antonio, Texas for the Calaveras Lake Bridge.

Owner: CPS Energy San Antonio

Contractor: Austin Bridge & Road

Location: San Antonio, Texas

Solution: Deep Foundations

Industry: Maritime, Transportation

Techniques: Drilled Shafts

Owner: CPS Energy San Antonio

Contractor: Austin Bridge & Road

Location: San Antonio, Texas

Solution: Deep Foundations

Industry: Maritime, Transportation

Techniques: Drilled Shafts

A.H. Beck installs drill shafts using an A.H. Beck custom hydraulic drill in San Antonio, Texas for the Calaveras Lake Bridge.

Overview:

All 136 lake bridge drill shafts were constructed on A. H. Beck barges using a A. H. Beck manufactured custom hydraulic drill attached to 135 ton Lieberr. A 50’ x 60’ barge was used to provide 3,560 cyds. of specially designed mix using A. H. Beck Volumetric mixers. A total of 3200 tons of rock, 2700 tons of sand and 1500 tons of cement had to be ferried out onto lake to produce the concrete. Permanent Casing was used on all lake piers. Water depths ranged from 4’ along the banks to 24’ at deepest points.